NGL Project, Siri Island
-
Project information
-
Customer Payandan Company
-
Date Finished
-
Category Piping, metallic structure installation, pipe support installation, molding, concrete pouring
-
Project Siri Island
Project Summary
In this project, Sadat Sanat Zagros Co. was responsible for carrying out piping operations up to the commissioning stage with an approximate volume of 150,000 diameter inches, constructing and installing metallic structures with a total weight of 700,000 kg, and installing pipe supports with a volume of 190,000 kg. Additionally, molding, concrete pouring, foundation, and wall work were completed with a volume of 12,000 m². All operations were executed in accordance with the project’s quality standards and timeline.
Key Project Facts
- Client: Payandan Company
- Location: Siri Island
- Scope of Work: Piping, metallic structure installation, pipe support installation, molding, concrete pouring
- Piping Volume: 150,000 diameter inches
- Metallic Structure Volume: 700,000 kg
- Pipe Support Installation Volume: 190,000 kg
- Concrete Work Volume: 12,000 m²
Services Provided
- Piping operations until commissioning
- Construction and installation of metallic structures
- Installation of pipe supports
- Molding, concrete pouring, foundation, and wall work
- Adherence to quality and safety standards
Project Outcome
The project was successfully completed, meeting all quality and safety standards within the scheduled timeline.