Kangan Phase 19 – IGC Company
-
Project information
-
Customer IGC Company
-
Date Finished
-
Category Piping, pipe support installation, structure installation
-
Project Kangan
Project Summary
In this project, Sadat Sanat Zagros Co. was responsible for carrying out piping operations until commissioning with an approximate volume of 22,000 diameter inches, constructing and installing pipe supports with a total weight of 75,000 kg, painting and touch-up of pipes with an approximate volume of 98,000 m², painting and touch-up of supports with an approximate weight of 320,000 kg, and performing welding repairs with a volume of approximately 133,000 diameter inches. Additionally, lettering operations were conducted with a total of 6,420 items. All operations were executed in accordance with the project’s quality standards and timeline.
Key Project Facts
- Client: IGC Company
- Location: Kangan Phase 19
- Scope of Work: Piping, pipe support installation, pipe and support painting, welding repairs, lettering operations
- Piping Volume: 22,000 diameter inches
- Support Installation Volume: 75,000 kg
- Painting Volume (Pipes): 98,000 m²
- Painting Volume (Supports): 320,000 kg
- Welding Repair Volume: 133,000 diameter inches
- Lettering Operations Count: 6,420 items
Services Provided
- Piping operations until commissioning
- Construction and installation of pipe supports
- Painting and touch-up of pipes and supports
- Welding repairs and lettering operations
- Compliance with quality, safety standards, and project timeline
Project Outcome
The project was successfully completed, meeting all quality and safety standards, and was delivered to the client within the scheduled timeline.